Project in Progress: Grass Roots Office Refurbishment

It’s been a while since I last shared a project in progress with you, so I’m excited to show you some sneak-peek pictures of my current job.

I was hired by the Bath branch of Grass Roots to provide an entire office refurbishment across 3 floors.

Because the building needs to be fully-operational while we work, we have phased the project so as not to disrupt the running of the office. To date we have completed the WCs, wash and shower room, breakout room and kitchen. Next to be done is an open-plan ground floor office and to give you an idea of the size, there is approximately 50 staff – so it’s quite big! The entire project is set to be finished by September.

As you’ll see in the images below, the building gets a lot of natural light. We decided to make the most of that with fresh white walls and really bright accent colours based on their branding palette. I commissioned an illustrator to design the decals and had them made bespoke for the company. I think they really add character to the space.

Anyway, enough from me! It’s time to let the pictures do the talking:

All photographs by Nick Smith Photography.

Kitchen

Breakout Room

Breakout Room 2

Hallway

Shower Room

Shower

WC

Comments are closed.